SAFETY PROCEDURE

SAFETY PROCEDURE

1.      Do not attempt to install this air conditioner by yourself
2.      Do not operate the air conditioner with wet hands
3.      Avoid installing the air conditioner near a fi replace or other heating apparatus
4.      Do not turn the breaker off/on or disconnect/connect the power supply plug during operation
5.      Do not use intermediate connection of the power supply cord or the extension cord and do not connect many devices to one AC outlet.
6.      Install an earth leakage breaker depending on the place where the air conditioner is to be installed (humid ,places)
7.      Make sure the ceiling/wall is strong enough to hold the unit-weight. It may be necessary to build a strong wooden or metal frame to provide added support
8.      Turn the power OFF at the main power board  before opening the unit to check or repair electrical parts and wiring
9.      Keep your fingers and clothing away from any moving parts
10.  Clean up the site after the work, remembering to check that no metal scraps or bits of wiring have been left inside the unit being serviced
11.  Ventilate the room during the installation or testng the refrigeration system; make sure that, after the installation, no gas leaks are present, because this could produce toxic gas and dangerous if in contact with flames or heat-sources.
12.  be sure to wear protective clothing and safety shoes.
13.  must wear gloves when doing the installation work

14.  make sure the equipment used is in good condition and properly before use